Framing Begins

Cold weather has forced me to start working indoors.  I have everything set up in the basement now (miter saw, etc).

I finished framing the right wall (outer) this evening!  Pretty cool considering the whole thing was measured using CAD (quite an improvement over the Audrey).  Very little wasted lumber and very rigid.  The two small pieces held in place by elbows are temporary until the crossbeams can be installed (pending the other wall).

Right Wall Framing

Leave a Reply